Project

General

Profile

Test Plan » History » Version 9

« Previous - Version 9/15 (diff) - Next » - Current version
Luke Murphey, 07/11/2020 05:27 AM


Test Plan

  • Search works for all types of works (Perseus, Unbound, Berean)
  • Reading Work
    • Morphological analysis dialog works
    • Work can be downloaded
    • Copyright statement appears
    • Work renames are correctly redirected (https://textcritical.net/work/speeches-1)
    • Notes appear correctly
    • Parallel reading works
      • Loading a second work loads (when it is a related work)
      • The second work can be closed
        • URL is updated accordingly
      • The footnotes and the word dialogs work on both works
      • URL keeps the second work present when:
        • A verse is clicked
        • The next/previous chapter buttons are clicked
        • Going back through the history (and second work is dropped when you go back to a URL where the second work is not included)
      • Parallel URL argument is dropped when you change to an unrelated work
  • Search indexes can be created for the work types
  • Command-line commands work